Circular Quay Railway Station
Transport House NSW Public Schools
Fowler Caroma, Wetherill Park
Camden Sewerage Treatment Plant
Devon Street, Rosehill
Northern Distributor Extension HMAS Garden Island
HMAS Kutabull
HMAS Penguin Randwick Army Barracks
North Head Military Museum
Victoria Barracks
-
Our projects
Alkene Contracting are capable of undertaking projects of any size and complexity.
You can trust Alkene Contracting to provide complete project management. Our team will ensure every detail is attended to from start to finish, with a dedicated site supervisor and project manager available to provide reporting whenever you require.
To get an idea of our capabilities and experience, select a project summary from the menu on the the left. In addition to the companies listed in the project summaries, we have also had the pleasure of working with:
Alinta
Attiki
Baulderstone
Boeing
Brisland
Caroma
Defense Maintenance Management
Fitzwalters
Fowler
GHD
Jemena
Leightons
Lend Lease
Lipman
Lucas
Mainland Civil
Metropolitan Demolitions Group
NSW Department of Commerce
Nuplex
Olympia
Pacific Brands
Qantas
Reed
Roche
St Hilliers
Sydney Opera House
Sydney Water
Traditional Stonemasonry Company
Please feel free to contact us directly if you would like more information on any of the projects listed, or to discuss your own requirements.
-
Sydney Opera House
1992 — 1995
Sydney Opera House
Removal and replacement of 18,200 lineal metres of asbestos containing expansion jointing from the exterior of the Opera House sails. Removal and replacement of 1,050 tiles from the Opera House sails.
1999 — 2007
Sydney Opera House / St Hilliers / Trilogy
Removal of asbestos products from various locations throughout the Opera House including the removal and disposal of asbestos insulation from around the air conditioning fire dampers without disruption to the normal operations of the Opera House.
-
Customs House - Alfred Street Sydney
1997
Traditional Stonemasonry Company
Removal and disposal of 3,500 lineal metres of asbestos mortar from between the sandstone joints of the building.
Circular Quay Railway Station
2004
Traditional Stonemasonry Company
Removal and disposal of 13,000 lineal metres of asbestos mortar from between the granite facing panels whilst the railway station remained operational.
Transport House
2007
Traditional Stonemasonry Company
Removal and disposal of 4,400 lineal metres of asbestos mortar from between the sandstone joints of the building.
-
NSW Public Schools
2004 — Present
NSW Department of Commerce
Various asbestos removal projects mainly consisting of the removal and disposal of asbestos pipe insulation, asbestos cement products, contaminated soil and landscaping works at more than 100 schools in Sydney.
Fowler Caroma, Wetherill Park
2005
Fowler Caroma
Removal and disposal of 28,000m2 of asbestos cement roof and wall sheeting from occupied warehouse and offices at Wetherill Park and the decontamination of internal areas.
Camden Sewage Treatment Plant
2004
Sydney Water Corporation
Removal and disposal of 11,700 tonnes of asbestos contaminated soil from West Camden sewerage treatment plant and remediation of the site.
Devon Street, Rosehill
2006 — 2007
CIP / Mainland Civil
Removal and disposal of 9,700 tonnes of asbestos contaminated soil from Rosehill and remediation of affected areas.
Northern Distributor Extension
2007 — 2009
Reed Group Australia
Removal and disposal of 14,000 tonnes of asbestos contaminated soil from the Northern Distributor Extension, Woonona.
-
HMAS Garden Island
2004 — 2006
DMM / Lucas Stuart / Olympia Group / Metropolitan Demolitions
Removal of asbestos cement roofs, walls, eaves linings, electrical switch boards, asbestos pipe insulation.
HMAS Kutabull
2006 — 2008
DMM / Lucas Stuart / Olympia Group
Removal of asbestos containing putty material from windows, asbestos pipe insulation, asbestos cement walls and ceilings.
HMAS Penguin
2005 — 2008
DMM / Lucas Stuart / Olympia Group
Removal of asbestos from various buildings and remediation of contaminated soils from the sub floor area's of buildings.
-
Randwick Army Barracks
1999 — 2009
GHD / Fitzwalter / Olympia Group / Brisland
Relocating stockpiled asbestos contaminated soil (20,000 tonnes) to a new location, reform stockpile and fence. Removal and disposal of 1,300 tonnes of asbestos contaminated soil ‘General Solid’ and replace with validated topsoil, grass seed and maintain. Removal and disposal of ‘Restricted Solid’ asbestos containing soil. Removal and disposal of 100,000m2 of asbestos cement roof and wall sheeting.
North Head Military Museum
2004 — 2005
DMM / Lucas Stuart
Removal of asbestos cement roofs, walls, eaves, sealers.
Victoria Barracks
2004 — 2005
DMM / Lucas Stuart
Removal of asbestos cement roofs, ceilings, walls and ‘Restricted Solid’; asbestos contaminated soil.